Speciality Silica,Specialty Silica,Absorbent Powder And Thickening Agent,Prevent Caking With Long Storage Time Henan Minmetals East New Materials CO. LTD. , https://www.minmetals-easts.com
Boiler energy-saving transformation parts h-fin tube with ASMEÂ
Specification:
Boiler energy-saving transformation parts h-fin tube with ASME . Boiler pressure replacement parts finned tube with ASME standard designed for use in natural and forced convection space heating, our range of finned air heaters are suitable for increased heat transfer surface area and where higher wattage is required. Featuring rugged construction, these finned heaters can be used in a multitude of industrial environments. Finned tubular heaters are used for forced convection heating, air or gas heating systems. Finned tubular heaters/heating elements are customized to meet your specific application needs.This is the introduction about Boiler pressure replacement parts finned tube with ASME standard. This is the introduction about Boiler energy-saving transformation parts h-fin tube with ASME .
Introduction:
Â
1). Add the heat exchange area and reduce the number of tubes, also increase the fume flow section area to reduce the fume speed and abrasion.
2). HÂ type fin tube can be made to double HÂ type fin tube, high rigidness to fit long tube row.
3). HÂ type fin economizer arranged in line to make the space into many small zones, averaged air flow to reduce the abrasion.
4). With straight channel to gain the best ash-blowing effect.
5). The compact structure to reduce the weight and reduce the manufacturing cost.
Â
Â
Extruded aluminum fin tube
Â
Application
It is widely used for Heat exchanger ,Air-conditioner ,Refrigerator,Economizer
and other parts of Heat Industry.
Material of base pipe
Carbon&Alloy steel, or Stainless
Material of fins
Aluminium
Type of base pipe
Seamlesss,Welded
Type of fins
Extruded.L,LL,KL
OD of Base pipes
15mm-219mm
WT of base pipes
1.5-6mm
Height of fins
8mm-30mm
WT of fins
0.4mm-3.0mm
Pitch of fins
2.2mm-20mm
Length of blank area
according to Customer's request.
Length of finned tubes
≤23m
Application:
 In boilers, Economical low installation costs better performance boiler economizer for CFB boiler are heat exchange devices that heat fluids, usually water, up to but not normally beyond the boiling point of that fluid. Economical boiler economizers are so named because boiler economizers for water heating can make use of the enthalpy in fluid streams that are hot, but not hot enough to be used in a boiler, thereby recovering more useful enthalpy and improving the boiler's efficiency. Better performance boiler economizers are a device fitted to a boiler which saves energy by using the exhaust gases from the boiler to preheat the cold water used to fill it (the feed water).
Other products:
Â
Â
Our company:
Â
Shandong Hengtao Group, founded in 1995, is located in Gaomi City, Shandong Province. Hengtao Group has 470,000,000 RMB of total registered capital, 1,400,000 square meter of land coverage, about 2000 employees and over 3Â billion RMB of total assets.
We are one of the manufacturers of boiler and boiler parts in China. We have a team of engineers who have more than 20 years' experience in designing, manufacturing, engineering, supplying of boiler and its spare parts. We manufacture CFB boiler, enameled corrugated plate, enameled tubular air preheater, rotary air preheater, H-finned tube economizer, spiral finned tube economizer, membrane water wall, header and other customized boiler parts.
Work shop:
Â
Quality Control:
1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safety
 Â
FAQ:
Â
Q1: Which port is closest to your location?
A: Qingdao Port is closest to our factory, about 1Â hour driving distance to our place.
Â
Q2: How about your delivery time?
A: Generally, it will take 30-45 day after receiving your advance payemnt. The specific delivery time depends on the items and the quantity of your order.
Â
Q3: Do you offer overseas installation service?
A: Yes, we can send engineers or welders to help installation at site.
Contact us:
Tiago zhangÂ
Tel:0086-18363621969
Â
Â
Â
Â
Â
Â
Â
Â
Â
Â