Mine dedicated vehicle installation Talmaga retarder heavy downhill safety worry-free

There is a special fleet of mines in Sichuan Province with a total of nearly one hundred “weed-chai tanks” - 86 tons of mine-specific vehicles. The roads in the local mines are rough and uneven, and vehicles are heavily overloaded. The braking performance is declining, and safety accidents often occur. The loss of tires and brake pads is very large. The tires have to be replaced within two months and the brake pads must be replaced within one month, which increases the operating cost of the vehicle fleet. In the same mining area, other fleets withdrew from operations due to lack of profit, frequent accidents, and operating losses. As a result, the team owner urgently needed to verify the effect of the vehicle's safe braking with the eddy current retarder installed .

Weichai mine car Locomotive installed with Tellomar retarder

Team Principal mine dedicated person driving the car Tellabs Ma eddy current retarder installed three kilometers, only 2-3 file retarder complete safety downhill, step on the whole do not have air brakes. Vehicle safety Downhill braking is reliable and secure, ensuring the driver's life safety, and improving the operational efficiency. The user is very satisfied.

Readings:

CNC Precision Maching Metals Parts

Titanium Fasteners,Titanium Bike Parts,Titanium Beads,Titanium Alloy Standard Parts

Baoji Jintaoyue New Material Technology Co.,Ltd , https://www.jtytitanium.com