Dongfeng dragging two wrecker factory outlets

Wreckers are divided into traction tonnage: 2 tons of wreckers, 3 tons of wreckers, 5 tons of wreckers, 8 tons of wreckers, 10 tons of wreckers, 15 tons of wreckers, 25 tons of wreckers , 30 tons of wreckers, 50 tons of wreckers, 80 tons of wreckers

The difference between the blue card and the yellow card on the wrecker:

The condition of the blue card on the flat wrecker is: 1. The length of the vehicle must be less than or equal to 6 meters; 2. The tonnage of the household is less than or equal to 1.5 tons; 3. The total mass must be less than or equal to 4.5 tons.

The yellow card for the wrecker has to be issued an operation permit and is to be reviewed once a year (that is, 3 months). The urban area is not easy to go and it is necessary to go to the permit. The procedure is annoying and the cost is OK. Blue card does not need to run an operation permit, the urban area can also run, 2 years to review. Yellow card to be opened according to B, blue card C can be opened.

Dongfeng Duolika dragged two wreckers: Chaochai 120-horsepower four-engine, cold-pressurized, steam brake, with direction power, power steering, equipped with 7.50R16 Dongfeng original wire tire.

New single row forward turnable cab, thickened high-intensity front bumper, front fog lamp, adjustable crystal headlight, wide-view mirror, front sight glass, Dongfeng 5-speed gearbox, wheelbase of 3800mm.

Qingling Isuzu tow two road wrecker: Qingling Isuzu 120 horsepower, standard Euro IV EFI engine, with power direction, air brake, new tugboat 2, steel wire rope, spare tire, tire sleeve, jack 1 , with tools, tied rope 4, 7.00 wire tires.

JAC dragging two wreckers: Chaochai 136 horsepower, turbocharged 4102 engine, 3815mm wheelbase, 8.25-R16 tires, power steering, five gears, JAC original and onboard tools; modified configuration: LED lights 1, Double-assisted small wheel kits, tied straps, roots, L-shaped rails. Configuration manual, manual, chassis certification, vehicle certification and vouchers. (Spot) Flat 5.6 meters long, 2.3 meters wide, 4 tons of flat support, after the holding arm lift 1.9 tons.

Liberation of a wrecker and two wreckers: Xichai 140 hp, medium-cooled turbocharged CA4DF3-14E3F engine; a row of half-cab, vehicle tools, modified configuration: 1 LED lamp, dual auxiliary wheel rims, straps 肆Root, L-shaped frog pair. Configuration manual, manual, chassis certification, vehicle certification and vouchers. (To be ordered in advance) The flat plate is 6.2 meters long and 2.3 meters wide, with 4 tons of plate support and 1.9 tons of rear support arm.

Fukuda State four for two wreckers: Concord 154 hp, 8.25-R16 wire tires, 3800 wheelbase, 6-speed gearbox, with original urea irrigation, cab can be flipped, with reversing images, upload configuration. Modified configuration: 1 LED lamp, 2 sets of auxiliary small wheels, 2 straps, 2 L-shaped frogs. Configuration manual, manual, chassis certification, vehicle certification and vouchers. (Spot) Flat 5.6 meters long, 2.3 meters wide, 4 tons of flat support, after the holding arm lift 1.9 tons.

Desktop High Torque Winding Machine

In order to ensure the normal work of the winding machine, in addition to the correct use according to the operating procedures, pay attention to the normal monitoring and maintenance in the operation process, regular inspection should also be carried out to do a good job of the winding machine Maintenance work. In this way, some faults can be eliminated in time to prevent faults and ensure the safe and reliable operation of the winding machine. The time interval of regular maintenance can be determined according to the form of winding machine and the use environment.


The contents of regular maintenance are as follows:

â‘  Cleaning winding machine. Remove the dust and oil sludge outside the frame of winding machine in time. If the environment is dusty, it is better to clean it once a day.

â‘¡ Check and clean the wiring terminal of winding machine. Check whether the connection screws of the junction box are loose or burned.

â‘¢ Check the screws of each fixed part, including anchor screw, end cover screw, bearing cover screw, etc. Tighten the loose nut.

Transformer Coil Winding Machine,Toroid Transformer Winding Machine,Desktop High Torque Winding Machine,Toroid Transformer Winding Machine Belt

SUZHOU DEGU MACHINERY CO.,LTD , https://www.deguwindingmachine.com