The correct method of preheating the suction truck is to cover the radiator first, open the drain valve, and continuously inject 60~70°C clean soft water into the radiator. When touching the drain valve by hand, feel hot. Close the drain valve, add 90 to
Model NO.: PD-2 HS Code: 90183100 Model NO.: PD-2
Development of Ferroelectric Cathode Vacuum Diode Test Device for Strong Emission Current Core Tip: The ferroelectric cathode (also called cold cathode) material is a new type of functional material that obtains pulsed high-current electron emission from the surface of a ferroelectric material un
In order to summarize the pilot experience of the exchange of methanol vehicles and deepen the pilot work of methanol vehicles, on October 9, 2015, the Department of Energy and Comprehensive Utilization of the Ministry of Industry and Information Technology organized a seminar on the pilot work of
As a part of power lines, power cables are widely used due to their low failure rate, safety, reliability, and flexible outgoing lines. However, if it fails, maintenance is more difficult and dangerous, so special attention should be paid to inspection and testing. Work Precautions The cable to
The "Taiwan Machine Tool New Products Presentation" sponsored by the Taiwan Trade Center and the China Legal Development Center Zhongwei Development Center was successfully held during CIMES2014. Director Zhang Qiren of Zhongwei Development Center, Hao Ming, President of China Na