Process for recovering ferrochrome from chromium slag

Ferrochrome smelting slag referred to as chromium slag, solid waste produced when smelting ferrochrome alloy, these solid waste if not scientific and effective treatment, it will cause great threat to the environment and human health, while ferrochrome slag recycling Not only can it obtain certain

Lead metal GB496-64

Lead number 1 2 3 4 5 6 Code Pb-1 Pb-2 Pb-3 Pb-4 Pb-5 Pb-6 chemical composition(%) Pb≮ 99.994 99.99 99.98 99.95 99.9 99.5 Impurity is not greater than 0.0005 0.0005 0.001 0.0015 0.002 0.002 Ag 0.0005 0.001 0.001 0.001 0.002 0.004 Cu 0.0005 0.001 0.004 0

MaxMoly Molybdenum Mine, British Columbia, Canada

In late May 2006, Roka Mines began the underground and ground development of the first phase of the mine. The company has been processing power is currently being demolished 900 t / day mill mines and mineral processing plants, mines present a detailed investigation grinding position suggestion, the

Automated inspection of Jinan Iron and Steel Sinter

Abstract:The existent test technology and the problems of the sinter at Jigang are analyzed and automatic reconstruction project are brought forward aiming at the test technological process. This system has the features such as apparatus being simple, the cost being lower,test data being objective

Xiangshan Pyrite Mine Concentrator

To the mountains pyrite beneficiation plant Sulfur iron ore deposits of the type shown in Table 1, at home and abroad pyrite beneficiation indicators in Table 2. The factory was designed by the Chemical Mine Design and Research Institute of the Ministry of Chemical Industry in 1961. It was put in

Sand gold deposit mining

1. Overview of sand gold deposit mining       There are two broad approaches open pit mining and underground mining deposits in sand mining gold. Underground mining is used less in China and will not be introduced here.       Open pit mining of sand gold is divided i