The total investment of 248 million Dongfeng Army Steel Factory is in its infancy


The Dongfeng Company's military product production base capacity enhancement and reconstruction project successfully laid the foundation on February 25 this year, and officially commenced on May 29. Yesterday morning, the reporter saw at the scene of the military product production base in the A district of Shiyan Industrial New District. The main steel frame of the plant was basically installed. It is expected that by the end of November, the construction of the first phase of the workshop can be successfully completed.

With the construction of a modernized steel plant, this important project that will integrate and optimize Dongfeng’s military production resources and strengthen its military development strategy will also enter the peak period of construction. Yesterday afternoon, Guo Guangzhong, director of the Military Productivity Capacity Development Office, pointed to a progress chart on the construction site and said: “We are striving to complete the construction of the plant on November 28. In December, the construction of water, electricity, and gas will be put into place. The equipment will enter the facility in January 2013. Installation and commissioning phase."

"The project has been started so far and has received the attention of many leaders of the province and city and the support of multiple departments." Guo Guangzhong told reporters that the project was included in the "green channel" service project, Shiyan Industrial New Area Management Committee has always insisted on "special handling, side The principle of establishing a border office is to strive to shorten the processing time, simplify the examination and approval procedures, and accelerate the speed of the project. Since the project was launched, the Hubei Provincial Party Committee, the PLA General Armament Department, Dongfeng Corporation, and Shiyan City have all attached great importance to it. Provincial, city, and district leaders have visited the site several times to conduct special research on the progress of the project.

The project covers a planned area of ​​1200 mu and is constructed in two phases. The total investment for the first phase is 248 million yuan. The construction includes the welding workshop, painting shop, assembly shop, maintenance workshop, modified/armoured protection positions, and ancillary facilities. , The main production of carrying and non-bearing series of military off-road vehicles, with an annual output of 5000 military vehicles with an annual production capacity, the annual output value will reach 3 billion yuan, the annual tax of more than 200 million yuan, more than 400 new employees. The second phase is mainly for the expansion of military products and the construction of civilian products.

Pipe Cutting Machine

A pipe cutting machine shear, historically known as a lever shear and sometimes as a crocodile shear, is a metal-cutting shear with a hinged jaw, powered by a flywheel or hydraulic cylinder. Alligator shears are generally set up as stand-alone shears; however, there are types for excavators. They are generally used to cut ferrous members, such as rebar, pipe, angle iron, or I-beams.

Steel Pipes Shear, Iron Pipes Shear, Metal Pipes Shear, Copper Pipes Shear

Jiangyin Metallurgy Hydraulic Machinery Factory , https://www.jiangyinyejing.com