How to build a three-dimensional garage with first-rate quality and customer satisfaction is our eternal pursuit of Yongmo Machinery. Therefore, we must grasp every aspect of the installation process of the three-dimensional garage. For example, entry preparation, construction site management, installation process control, equipment commissioning and testing, equipment acceptance and handover. Outdoor Repair Supplies,Waterproof Repair Kit,Field Repair Kit,Outdoor Research Repair Kit KRONYO United Co., Ltd. , https://www.kronyotaiwan.com
After entering the site to prepare parking equipment, after the factory is completed, some preparations are required before entering the site. The main contents are: First, study the contract, drawing, relevant departments to carry out technical disclosure and pre-post training; secondly review the scene whether the scene meets the entry conditions; again, review the construction plan and delivery plan, ready to receive goods, determine The storage place of the goods and the protection measures; Finally, the “Architectural Construction Organization Plan†was drafted to handle the entry procedures. According to the project scale, type of garage, and duration requirements, the configuration of the installation team, mechanical and electrical technicians shall be determined; the on-site construction billboards shall be produced and the construction safety protection facilities shall be completed.
Construction Site Management When the goods of the manufacturer arrive at the construction site, the perfect construction site management measures will help protect the environment and avoid noise disturbance. At the same time, strengthening the construction site management can also establish a good brand image of the company. In the construction process, pay attention to civilized construction, hanging construction notice cards, post safety operation regulations, job duties of various types of jobs, safety warnings and other graphic signs; scientific organization of construction to avoid the impact of night-time construction on the surrounding residents.
Installation process management The installation process control is directly related to the smooth implementation of project coordination, construction period, payment, quality, and other aspects. The following links need to be controlled: shipment control, schedule control, visa control, quality control, cost control , security control, etc.
Commissioning and experimental operation After commissioning the electrical engineer to enter the site, he first familiarizes himself with the installation of the project and field equipment, listens to reports from the self-checking and self-tuning of the mechatronics personnel, and verifies each one by one to check whether the equipment installation meets the technical requirements; in cooperation with the on-site electromechanical personnel The commissioning work was fully carried out to ensure the quality of commissioning, and lay a solid foundation for the future trial operation of the three-dimensional garage.
After the completion of the commissioning test, an empty test run is performed to check the stability of the equipment and the technical parameters of the equipment to meet the design requirements. Secondly, the heavy load test is performed to check whether the bearing strength and related parameters of the equipment meet the specification standards. Problems were rectified in time.
The acceptance and handover is the last link in the implementation of the project. It is necessary to complete the internal acceptance of the manufacturer, pass the acceptance of the Technical Supervision Bureau, and handle the handover procedures with Party A.