Dixin High Speed Roof Tile Double Layer Roll Forming Machine

Model NO.: 840/850
Warranty: 2 Years
Diameter: 70mm
Forming Speed(M/Min): About 8-12
Cutting Mode: Automatic Hydraulic Cut to Length
Cutter Material: Cr12 Mould Steel
Thickness: 0.3-0.8mm
Forming Station: 13steps/13steps
Type: Roll Forming Machine
Method: Steel
Processing: Steel
Trademark: DIXIN
Transport Package: Standard Export Package, Water-Proof Package
Specification: CE, SGS
Origin: Cangzhou City, Hebei Province, China
HS Code: 84552210
Dixin High Speed Roof Tile Double Layer Roll Forming Machine
Advantage of our roll forming machine machine
High quality
Lower cost 
Durableness
High efficiency
Reliable working
Low failure rate
Low energy consumption
Trouble free after sales service
 
The advantages of the double deck roll forming machine
1. High efficiency
2. Lower cost
3. Long life time: 30years
4. Low energy consumption
5. PLC computer control
6. No noise, no shake

 

Dixin High Speed Roof Tile Double Layer Roll Forming Machine
Dixin High Speed Roof Tile Double Layer Roll Forming MachineDixin High Speed Roof Tile Double Layer Roll Forming MachineDixin High Speed Roof Tile Double Layer Roll Forming MachineDixin High Speed Roof Tile Double Layer Roll Forming MachineDixin High Speed Roof Tile Double Layer Roll Forming Machine
Other spec.
1. Size: about 6*1.5*1.6m (L*W*H)
2. Weight: About 3.5 ton
3.  Decoiler Max. Capacity: 5000kgs
4.  Hydraulic station power: About 4Kw (Depend on final design)
5.  Cutting length: Cut-to-length

Packing:
1. One 40feet container for loading one set machine with mechanical decoiler. 
2. Main machine body and decoiler is load naked (tighten to container with steel wire rope). 
3. Spare parts and operating tools are loading in tooling box.
 
Delivery: about 20 days.
 
Where is your factory located ? How can I visit you ?
Dixin Roll forming machinery is located at Industrial Zone of Botou , Hebei Province of China. Welcome to visit us by:
 
1.Fly to BEIJING or TIANJIN Airport, then take high speed train from BEIJING NAN to CANGZHOU XI, about 1 hour, I will pick up you there.
2.Fly to SHANGHAI Airport, then take high speed train from SHANGHAI HONGQIAO to CANGZHOUXI, about 4.5 hour,I will pick up you there.
If you are interested in roll forming machine,welcome to contact me directly:
 

AB Gluing Injection Machine

Ab Gluing Injection Machine,Glue Filling And Sealing Machine,Air Filter Gluing Machine,Filter Gluing Machine

ChangZhou FENGJU Machinery Equipment CO., LTD , https://www.czfengjumachinery.com