Chongqing pickers use metal detectors to dig under the overpass

Picker smith plans scrap iron at the foot of the newly built cattle drip road overpass pier

Picker smith plans scrap iron at the foot of the newly built cattle drip road overpass pier

Yesterday, the Yuzhong District ox horn yak drip road (Niujiao to Jishui Rock) under the overpass is busy, more than 20 scavengers wield iron gongs, dance sledgehammers to dig "treasure" - crazy mining buried underground steel, fasteners and other metals, Some of them also used metal detectors. The reporter found that over 20 bridge piers were hollowed out.

Related officials said that this move seriously jeopardized the safety of overpasses and light rails.

Drill a pit around the pier

At about 10 o'clock in the morning, the reporter saw that under the overpass of the cattle drip road, several deep pits had been dug around the bridge pier.

Picker Zhang Deming is looking for "treasure" in the pit. Zhang wielded iron, tired and sweating.

The pit was about two meters deep, and Zhang continued to dig down and saw a thick steel bar. "Oh, another one," he said cheerfully.

Above the pit, a huge stone weighing about 1 ton is teetering. Worried that the huge rock rolled down, Zhang Deming received a thick wooden stick support. Regardless of the reporter’s dissuasion, he jumped into the pits again and when he pulled hard on another steel bar buried in the soil, the huge rock fell and almost hit him. “One good-natured scared face and hurriedly climbed out of the pit. I did not expect to take a short break, and he jumped into the pit again.

"I can dig about 30 kilograms a day," said Zhang, who had been digging the "Bao" under the overpass for four days and all sold to a nearby scrap purchasing station.

Digging "Bao" uses high technology

Not far away, a man holding a metal detector around the other pier to explore the "treasure." "There was something less than a minute, the detector issued a "drop, drop" sound, the man was pleasantly surprised, and gathered more than a dozen scavengers from around the country collectively shirtless. In a few minutes time, buried steel, fasteners and other metal will be buried. It was dug up. Less than an hour later, they collectively dug up more than a dozen steel bars and then excavated around the other pier next to them.”We collectively worked and evenly allocated 1 man. The reporter found that due to the overpass adjacent to the light rail Niujiao Station, the pier under the light rail was also excavated.

"What if it affects the safety of the pier?" asked the reporter. "A man who does not care about your business responds with a disgruntled face.

Endanger the safety of overpass light rail

The reporter roughly counted the numbers. At least 20 piers including light rail piers under the overpass were hollowed out and the deepest point was 2 meters. Under the overpass, the entire slope that had been previously cast with cement became devastated.

"At around 6 in the morning, these scavengers came to the excavation of a resident under the overpass. Mr. Zhou said that this phenomenon has continued for a week. At most, more than 50 people participated in the war. Some pick-ups even directly rebared the piers. .

The picksmiths were so embarrassed. Why didn’t anyone control? Zhou said that due to the completion of the overpass project and the remote location, it was not easy to be discovered. In the past week, no relevant units had interrogated the matter. Fear of revenge, the surrounding residents did not dare to speak. A staff member of the light rail ox horn station confirmed Mr. Zhou’s statement.

“These earth pits have jeopardized the safety of overpasses and light rails. According to the relevant person in charge of the municipal municipal facilities administration, although the old metal buried under the ground has been excavated, the slope surface of the cement has been destroyed. Once the rain rises, flood irrigation occurs. Earth pits can easily cause landslides or bridge pier foundations to collapse, seriously affecting safety.

At present, the municipal municipal facilities management department has begun to investigate and deal with this matter.

Automotive Series

Advantages of Casting Process:

1: Suitable for complicated structures.

2: Customized, made to customer's drawing or prototype.

3: Casting provides Precise shape, less material machining.
4: Wide weight variation allowed,from 1kg to 40kgs.
5: Wide range of material spec can be selected:

GG450,GG500,GG700,ASTM 65-45-12, SIMO Alloy Iron

6: Parts can be used for different industries, Auto Exhaust Pipe, Hydraulic, Agricultural Machinery Parts

7: High temperature resistant

Certificastes and Documents Provided:

- PPAP

- CPK

- SPC

- MAS

- Non-Destructive Report, UT,MPT

Packaging and Transport : Plywood Case packing

1) Standard plywood case for outside packing.
2) Rusty proof oil or liquid applied for each part.
3) Parts are segerated one by one with plastic plate.

Delivery Terms:

- FOB

- DDU

- DDA

- CIF

- CNF

Our Services

1: MOQ: 5 pcs

2: Sampling Time: 30 days including moulding

3: Within 24 hours response for each email

4: Flexible payment terms provided

5: Weekly project update

Car Exhaust Part,Car Exhaust Pipe Part,Automotive Exhaust Part,Car Casting Exhaust Part

ZHEJIANG J.B AUTO PARTS CO., LTD. , https://www.jbcastings.com