Carbowax Polyethylene Glycol PEG Series China Polyethylene Glycol ,Cas 25322-68-3 manufacturer, choose the high quality Surfactant Carbowax 200,Peg 200 Cas No.25322-68-3, etc. Polyethylene Glycol 400,Cas 25322-68-3,Surfactant Carbowax 200,Peg 200 Cas No.25322-68-3 Jiangsu Maoheng Chemical Co.,LTD , https://www.jsmhchemical.com
Matters needing attention in the basic setting of concrete mixing plant
The mixing station is often used in large-scale projects with large concrete construction, long construction period and concentrated construction sites. Because the concrete mixing station is a combined device for mixing concrete, the layout of the site is particularly important, and various systems need to be assembled scientifically and scientifically. The installation site is restricted, which will result in the concrete mixing station not being able to complete the system assembly reasonably. It is also necessary to consider whether it is convenient to transport the conveyed materials and finished materials during the operation of the concrete mixing plant. Only the reasonable layout of the site can ensure the progress of the project. Then, what should be paid attention to when the concrete mixing station is used as a foundation - 1. The mixing station can be arranged flexibly according to the actual situation of the construction site. However, before installation, the site should be level and intact, and compacted. At the same time, according to the large sample position (the large sample should be retained until the equipment is installed), the supporting foundation of each component is prepared in advance, and the mixed material storage bin and powder are prepared. The concrete abutment of the material supply system should retain the secondary grouting holes of the anchor bolts. 2. The installation foundation of the equipment should be selected in the open area to shorten the loading cycle of the loader. At the same time, it can also ensure that the finished material transportation vehicles are convenient to turn around, smooth and powerful, and do not interfere with each other. 3. When prefabricating the foundation, ensure the flatness and various size requirements, so that the equipment is installed firmly and the connection is reasonable. Because the quality of the foundation will affect the normal operation and quality of the equipment. 4. In order to facilitate the loading of the loader, the loading pier should be set on the loading side of the batching unit, and a patrol channel with free access should be reserved between the batching unit to facilitate the inspection and maintenance of the equipment and operation. maintenance. At the same time, a protective fence should be set up between the loading pier and the batching unit to avoid the unfavorable impact on the normal operation of the concrete mixing belt collecting belt conveyor after the material deposited by the loader is piled up.