Success of power transmission from relay pump station in downtown Tianjin

On the 17th, it was learned from the State Grid Tianjin East Branch that the northeast suburb thermal power plant heating (central urban area) main ring network engineering grade 1 relay pump station and the secondary relay pump station were successfully delivered, which was Hedong District, Heping District and The normal heating and heating of residents and enterprises and institutions in some areas of Hexi District provide protection.

The construction of the relay pumping station in the downtown area is an important part of the heat conversion project of the Tianjin No. 1 Thermal Power Plant, one of the 20 people’s projects in this year. The 24.7 km heating pipeline laid by the Dongbei Thermal Power Plant is connected to the existing pipe network of the No. 1 thermal power plant. The existing pipe network with steam heating in the central urban area was transformed into a hot water heating pipe network to replace the existing heating capacity of the first thermal power plant. After the renovation, the heating area was increased from the original 9.7 million square meters to 11.7 million square meters.

Wire Rope Slings

Steel Wire Rope Sling,Stainless Steel Wire Rope Slings,Galvanized Steel Wire Rope Sling,Steel Wire Rope Slings

Jiangsu Ruijin Sling Co.,Ltd. , https://www.cnsteelcable.com